- Posts: 12160
- Thank you received: 0
Tumbler Build - For cleaning plasma cut parts.
And I love that OHS approved chain guard...
machinedude wrote: despite the noise of media and parts clanking around i would welcome it over doing hand work on parts without a doubt. hand work is another one of those things you learn to hate as you get older
the noise is not so bad since your hearing is already half shot in the ass at my stage so it's a win win
Please Log in to join the conversation.
- thefabricator03
- Topic Author
- New Member
-
- Thank you received: 0
Next step is to finish the design of the enclosure and the setup for adding and removing parts quickly.
Please Log in to join the conversation.
- tommylight
-
- Offline
- Administrator
-
- Posts: 22012
- Thank you received: 4
LOL, and wheelbarrow ???thefabricator03 wrote: If I add a chain guard it will take away the excitement of getting caught up in the chain :lol:
Next step is to finish the design of the enclosure and the setup for adding and removing parts quickly.
For loading with it, make a ramp on the other side!
BTW, just in case you use this idea, if you even notice any of the workers missing in the shop, check the tumbler!
Please Log in to join the conversation.
- machinedude
- Offline
- Platinum Member
-
- Posts: 715
- Thank you received: 0
Please Log in to join the conversation.
- thefabricator03
- Topic Author
- New Member
-
- Thank you received: 0
Please Log in to join the conversation.
- thefabricator03
- Topic Author
- New Member
-
- Thank you received: 0
Not quiet but bearable.
Also was not expecting the parts to be ready after one minute. Ill play around with the next couple of batches and record my results.
Please Log in to join the conversation.
- tommylight
-
- Offline
- Administrator
-
- Posts: 22012
- Thank you received: 4
That saves a lot of work, a lot ! Now you got me thinking i need one, and i do not cut, yet!thefabricator03 wrote: Also was not expecting the parts to be ready after one minute.
Please Log in to join the conversation.
- thefabricator03
- Topic Author
- New Member
-
- Thank you received: 0
tommylight wrote: That saves a lot of work, a lot ! Now you got me thinking i need one, and i do not cut, yet!
Yeah my guys will be happy. Saves chipping the dross off with a chisel. I get nearly 400 of those cleats to a sheet. They all cleaned up so easily. Very Very Happy with the results.
Please Log in to join the conversation.
- thefabricator03
- Topic Author
- New Member
-
- Thank you received: 0
After some testing I decided that 25 RPM was too fast for the 900mm diameter drum. I have put on a 36 tooth sproket which will limit the top speed to 16 RPM. it also multiples the torque by 1.8 to give 1008Nm at the shaft.
Part tray with removable front gate. The plan is to butt the tray up to the drum and the lip of the tray will sit into the opening. I will then remove the gate and push the parts in. I have not tried it yet as I need another chain link.
Please Log in to join the conversation.
