- Posts: 12160
- Thank you received: 0
Hypertherm 45XP sanity check
5 years 6 months ago #205499
by rodw
Well if you make the Plasmac gantry 90 metres long like one shop I know, the need for a crane will be much reduced!
Replied by rodw on topic Hypertherm 45XP sanity check
Mud wrote: Haha - food for thought! Will PlasmaC be 5 axis ready by then?
Well if you make the Plasmac gantry 90 metres long like one shop I know, the need for a crane will be much reduced!
Please Log in to join the conversation.
5 years 6 months ago #205564
by andypugh
Cripes! I thought I was joking.
(Though whilst thinking that the idea had merit)
Replied by andypugh on topic Hypertherm 45XP sanity check
rodw wrote: Well if you make the Plasmac gantry 90 metres long like one shop I know, the need for a crane will be much reduced!
Cripes! I thought I was joking.
(Though whilst thinking that the idea had merit)
Please Log in to join the conversation.
5 years 6 months ago #205606
by Mud
Replied by Mud on topic Hypertherm 45XP sanity check
My little building won't come close to 90m, but likely around 7x12-20m or so - worth some consideration!
I think the most viable solution may be to use a typical elevated track for the lifting gantry (coming off of the frame of the building), and mount the plasma to the floor (avoiding excess moving mass, over-long z axis, frame deflection, etc.). I would use a separate table.
Plenty of time to change my mind...
I think the most viable solution may be to use a typical elevated track for the lifting gantry (coming off of the frame of the building), and mount the plasma to the floor (avoiding excess moving mass, over-long z axis, frame deflection, etc.). I would use a separate table.
Plenty of time to change my mind...
Please Log in to join the conversation.
Time to create page: 0.052 seconds
