I'm glad you at least appreciate the dilemma :)

@grandixximo
If Rob Ellenberg is offering advice/cooperation I would not hesitate to accept it. Having written the current planner you'll likely get more sound information (and even opinion) )there in one email than on 40 pages of forum thread. Grotius flatly refused which was a great mistake but I think our clothoid approach was likely doomed to fail anyway.
Last edit: 9 months 1 week ago by Aciera.
The following user(s) said Thank You: grandixximo, pommen, besriworld, endian

Please Log in or Create an account to join the conversation.

More
9 months 1 week ago - 9 months 1 week ago #341852 by grandixximo
@Aciera
Yes, I think Robert and YangYang will have much to discuss. I will probably mostly be on the sidelines, help YangYang with the English mostly, I think he'll do better than he thinks.

@ihavenofish
spikes you see on the scope are ddt of ddt of ddt, planner_type 1 has been running on real machines, it is not as expetimental as you might think, far from perfect I can agree, I can understand that you don't want to put your hardware on the line.
Not to worry about, I have hardware, you can see at www.aitalmac.com
Anyhow thank you for your inputs, have give me lots to think about!
Last edit: 9 months 1 week ago by grandixximo.
The following user(s) said Thank You: akb1212, besriworld

Please Log in or Create an account to join the conversation.

More
9 months 1 week ago #341853 by automata
I agree with Aciera. Rob will have a lot of good and implementable suggestion and cooperating with him to get the planner out would be a good way forward.

On the topic of path modification v/s jerk limitation, you cannot think about one as separate from the other.
Imagine a path that has lines and tangent arcs i.e., a straight line in Y axis followed by an arc in the XY plane. Right before the transition point, the velocity and acceleration in the X Axis are 0. At the transition point, you can assume the velocity on the X axis will start increasing in a sinusoidal fashion from 0 whereas the acceleration will start at a high value. So even if the velocity is continuous, the acceleration can not be made continuous which will lead to a high jerk due to the acceleration discontinuity.

To remedy the acceleration discontinuity, one method is to come to a full stop at the transition. Another method is to add a transition i.e., modify the path between the two segments which is C2 continuous (second derivative continuous) at both the ends where it intersects the segments. Examples are clothoids, beziers, splines etc. as proposed by multiple research articles on this topic.

The grotius clothoid solution is one step in the right direction. IT will require to add a new geometry to the the motion queue called clothoid in addition to addline and addarc functions that are already being used. Clothoids and some splines are parameterizable by their path length and so can be used much easier in trajectory planning.

In essence, the tanjential jerk (to the path) can be managed by changing the trajectory execution timing parameter whereas the normal jerk can be reduced by changing the path (including a small deviation).

-automata
The following user(s) said Thank You: grandixximo, akb1212

Please Log in or Create an account to join the conversation.

More
9 months 1 week ago - 9 months 1 week ago #341855 by Aciera

Not to worry about, I have hardware,


Oo, no kidding. Not much use for a giveaway CNC mill there.
Last edit: 9 months 1 week ago by Aciera.

Please Log in or Create an account to join the conversation.

More
9 months 1 week ago #341856 by grandixximo
This is a draft for a new TP implementation plan, revised according to my thinking by AI

---

## LinuxCNC S-Curve Trajectory Planner Rewrite

### Architecture Principles

**RT thread (250µs capable):** Only evaluates pre-computed polynomials. No planning, no Ruckig, no kinematics. Just `position = evaluate_polynomial(t)` and send to drives.

**Userspace:** All heavy computation. Ruckig, backward velocity pass, kinematics, blending. Not tied to servo cycle.

**Predictive Handoff:** When replanning is needed (feed override, etc), userspace plans from a predicted future state, not current state. RT continues executing until the handoff time, then seamlessly transitions. This decouples userspace latency from RT determinism.

**Buffer Management:** Track buffer in TIME, not segment count. Short segments and long segments treated appropriately.

---

### Phase 0: Foundation - Port Tormach 9D Architecture

```
├── 0.1 Port dual-layer architecture (userspace planning / RT execution)
├── 0.2 Port atomic state sharing between layers
├── 0.3 Port 9D vector abstractions
├── 0.4 Port lock-free segment queue
├── 0.5 Port lookahead buffer
├── 0.6 Port backward velocity pass (computeLimitingVelocities)
├── 0.7 Verify trapezoidal works through new architecture
├── 0.8 Verify E-stop works
└── 0.9 Test: motion runs, velocity anticipates corners
```

Meeting with Robert Ellenberg on the 28th should clarify what's clean to port vs what needs adaptation.

---

### Phase 1: Move Kinematics to Userspace

```
├── 1.1 Userspace samples path, computes Jacobian
├── 1.2 Joint limit pre-calculation (YangYang)
├── 1.3 Joint limits fed into backward velocity pass
├── 1.4 RT receives joint-space polynomial segments
├── 1.5 Test on non-trivial kinematics (5-axis, etc)
└── 1.6 Verify E-stop works
```

This is the risky phase. State consistency between userspace and RT must be bulletproof.

---

### Phase 2: Ruckig Integration

```
├── 2.1 Add Ruckig to build system
├── 2.2 Backward pass computes v_entry, v_exit per segment
├── 2.3 Forward pass: Ruckig solves each segment with entry/exit constraints
├── 2.4 Output: joint-space polynomials to RT queue
├── 2.5 Scrap sp_scurve.c (current S-curve implementation)
├── 2.6 Test: globally optimal jerk-limited velocity profiles
└── 2.7 Verify E-stop works
```

Ruckig runs in userspace only. Takes ~1ms per solve. RT never waits for it.

---

### Phase 3: Predictive Handoff System

```
├── 3.1 RT continuously publishes execution state (segment ID, time within segment)
├── 3.2 Define buffer time parameters in INI:
│ MIN_BUFFER_TIME_MS = 100 (RT warns if below)
│ TARGET_BUFFER_TIME_MS = 200 (userspace maintains this)
│ MAX_BUFFER_TIME_MS = 500 (userspace pauses if above)
├── 3.3 Define HANDOFF_HORIZON_MS = 50 (how far ahead to plan handoff point)
├── 3.4 Implement TIME-based buffer level tracking
├── 3.5 Adaptive throttling: userspace speeds up if buffer runs thin
├── 3.6 Predictive handoff flow:
│ a) Feed override changes (or other replan trigger)
│ b) Userspace picks T_handoff = now + HANDOFF_HORIZON
│ c) Userspace evaluates current trajectory at T_handoff to get predicted state
│ d) Ruckig plans from predicted state to target with new constraints
│ e) New segments tagged with handoff time, pushed to queue
│ f) RT executes old trajectory until T_handoff, then switches seamlessly
├── 3.7 Test: rapid feed override changes, verify smooth transitions
├── 3.8 Test: userspace delays (artificial), verify RT never starves
└── 3.9 Verify E-stop works
```

Key insight: 100ms feed override latency is invisible to humans. RT starvation is catastrophic. Plan ahead, never make RT wait.

---

### Phase 4: Blending

```
├── 4.1 Blend geometry using Beziers (not arcs)
│ - Works naturally in 9D (arcs are fundamentally 2D)
│ - Faster to evaluate (polynomial vs sin/cos)
│ - Smoother curvature transitions (no curvature discontinuity at entry/exit)
│ - Steadier velocity through corners
├── 4.2 Blend size respects G64 P tolerance (same contract as current LinuxCNC)
├── 4.3 Blend velocity limits feed into backward pass
├── 4.4 Ruckig solves blend segments
├── 4.5 Test: continuous cutting, no velocity bobbing through corners
└── 4.6 Verify E-stop works
```

---

### Phase 5: Hardening

```
├── 5.1 Test with artificial userspace delays (verify RT never blocks)
├── 5.2 Test at 250µs servo period
├── 5.3 Singularity handling (automatic slowdown near singularities, no faults)
├── 5.4 Edge cases: very short segments, reversals, exact stop (G61)
├── 5.5 Spindle sync moves (rigid tap, threading) - automatic fallback to trapezoidal
├── 5.6 Probe moves - automatic fallback to trapezoidal
├── 5.7 HAL pin for manual planner_type selection (user can force trapezoidal via M-code)
├── 5.8 Stress test: worst case G-code with rapid feed override changes
└── 5.9 Final E-stop verification under all conditions
```

Trapezoidal fallback stays for special cases. Some operations need tight timing that S-curve planning would compromise.

---

### Phase 6: Cleanup

```
├── 6.1 Remove dead code from tp.c (old S-curve paths)
├── 6.2 Remove sp_scurve.c, sp_scurve.h entirely
├── 6.3 Update HAL pins:
│ - jerk-cmd outputs
│ - planner status
│ - buffer level (time remaining)
│ - handoff state
├── 6.4 Update documentation
├── 6.5 INI file changes:
│ - JERK_LIMIT per axis
│ - MIN_BUFFER_TIME_MS
│ - TARGET_BUFFER_TIME_MS
│ - MAX_BUFFER_TIME_MS
│ - HANDOFF_HORIZON_MS
│ - Deprecate old parameters
└── 6.6 Backward compatibility: PLANNER_TYPE=0 still works (pure trapezoidal)
```

---

### Summary of Key Design Decisions

| Decision | Rationale |
|
|
|
| RT only evaluates polynomials | 250µs determinism, no jitter |
| Ruckig in userspace only | Heavy math stays out of RT |
| Predictive Handoff | Decouples userspace latency from RT timing |
| TIME-based buffer | Handles short and long segments correctly |
| Beziers for blending | 9D native, faster, smoother than arcs |
| Trapezoidal fallback | Threading, tapping, probing need it |
| E-stop verified every phase | Can't wait until the end |

Any feedback will be considered, and appreciated, this is obviously a plan far from being set in stone, just a wild idea at the moment...
The following user(s) said Thank You: akb1212, tommylight, besriworld, endian, Unlogic

Please Log in or Create an account to join the conversation.

More
9 months 1 week ago #341862 by tommylight
@ grandixximo ,
Thank you for the immense amount of time and effort you and your team are putting into this.
Side note, should i contact Grotius by phone and see if he can spare some time, or should i wait for now?