- Posts: 88
- Thank you received: 0
2+2+3 More Plasma builds, double the joy ! 3X2M and 2.5X1.5M cnc plasma build.
Please Log in to join the conversation.
tommylight wrote: The parts are back from powder coating and ................ oh hell, not properly painted, the black can bee seen under the red powder coating, so they skimped a lot on the thickness.
Bloody @#$@%%@$!^@$
If it was already powdercoated black, that is not surprising. Its actually a very expensive process to re-powdercoat becasue the existing coat needs to be burnt off at high temperature and if you are changing the colour, I think problems will occur for sure. You need to get back to bare sandblasted metal. Put it down to experience
Please Log in to join the conversation.
- snowgoer540
- Offline
- Platinum Member
-
- Posts: 2580
- Thank you received: 0
tommylight wrote: Bloody @#$@%%@$!^@$
Paid 100 Euro for it, sending them back will waste another week and i do can not afford to waste all that time waiting again.
This is the exact reason that:
1. I hate outsourcing things. The feeling of disappointment when someone hands you something you paid good money for is the worst.
2. I'm super over critical of my work, to a fault. It's what holds me back from taking jobs, etc. a lot of the time. I don't like the though of handing someone something and having them feel disappointment in my work.
I guess the worry is something you get over. But it's there nonetheless.
Please Log in to join the conversation.
- tommylight
-
Topic Author
- Offline
- Administrator
-
- Posts: 22010
- Thank you received: 3
I would but i can not paint in my shop, it would end up messing everything there with paint sticking all over the place.
@Rod,
The order was to paint the legs black and beams red, seems like they did everything black and then occurred to them they made a mistake and rushed it and put a very thin coat of red.
@Snowwy
Same here, so many things i can not do as i am sure i can not get the quality i would like. And i live where quality is the last thing anyone looks for.
Thank you, all.
Please Log in to join the conversation.
tommylight wrote: @Rod,
The order was to paint the legs black and beams red, seems like they did everything black and then occurred to them they made a mistake and rushed it and put a very thin coat of red.
They should have stripped it back and started again. Its probably easier to make new beams and insist they powdercoat them properly. Powdercoat is not like paint. You can't just add another coat.
I had one part outsourced regularly which laser cut, machined and powdercoated. They always were getting something wrong. So I outsourced it to China and 3000 parts later, there has never been a problem!
Outsourcing definitely has its place but it brings a few challenges.
Please Log in to join the conversation.
- tommylight
-
Topic Author
- Offline
- Administrator
-
- Posts: 22010
- Thank you received: 3
Damn that felt like missing half of the head !
Tomorrow i am also busy working as the backlog of two lost days is to much, so in the evening i will have a look at how they look and take some pictures without the vinyl wrapping.
I do like the red though, it's fiery!
Please Log in to join the conversation.
- tommylight
-
Topic Author
- Offline
- Administrator
-
- Posts: 22010
- Thank you received: 3
Attachment not found
Marry Christmas.
Please Log in to join the conversation.
- machinedude
- Offline
- Platinum Member
-
- Posts: 715
- Thank you received: 0
Please Log in to join the conversation.
- tommylight
-
Topic Author
- Offline
- Administrator
-
- Posts: 22010
- Thank you received: 3
Go back a bit, there should be pictures of the new 108 sq meter shop somewhere, yup here it is:machinedude wrote: merry Christmas Tom. Santa needs to bring you a bigger work shop
things look a little tight in the space department
forum.linuxcnc.org/show-your-stuff/38547...ild?start=240#190568
So in total that makes for 80+30+108=218sqm ! Cr@p, still not enough !
There are plans to add another 70 to the shop as soon as possible. Plans, i said !
Thank you very much.
Please Log in to join the conversation.
- machinedude
- Offline
- Platinum Member
-
- Posts: 715
- Thank you received: 0
i seen you were working on additions to work space but it's late in the year so weather comes into play at some point. not sure where you find the energy to move at the pace you do
Please Log in to join the conversation.