6 years 5 months ago #168252 by tecno
Same phenomena all over the globe unfortunately. We who have retired have all the time we need for our projects, worse for those that have to earn every penny.

Please Log in to join the conversation.

More
6 years 5 months ago #168279 by tommylight
Sorry Gent's, was busy changing fuses in the main house distribution box to be able to power on the Mazak.
As advised by Andy, i did find fuses with the C denomination, since B ones at 40A would still trip on powering the beast. Now that i can power it, it decided to die on me, all the vents work, spindle drive has power and is ready, axis drives are dead, computer is dead, main controller is dead, etc.
Moving on, or not moving on since no delivery of painted parts !
This is getting aggravating.
Thank you .
Regards,
Tom.

Please Log in to join the conversation.

More
6 years 5 months ago #168280 by tecno
Shit, obviously you have a visit from Mr(fu-ing)Murphy as everything is going south for you.
Hang in there you will solve this.
Bengt

Please Log in to join the conversation.

More
6 years 5 months ago #168284 by tommylight
Yup, this is what i am dealing with right now:

Attachment not found

Please Log in to join the conversation.

More
6 years 5 months ago #168302 by rodw

tecno wrote: Shit, obviously you have a visit from Mr(fu-ing)Murphy as everything is going south for you.
Hang in there you will solve this.
Bengt


Don't forget O'toole's law which states Murphy was an Optimist!

Please Log in to join the conversation.

More
6 years 5 months ago #168308 by tommylight

rodw wrote:

tecno wrote: Shit, obviously you have a visit from Mr(fu-ing)Murphy as everything is going south for you.
Hang in there you will solve this.
Bengt


Don't forget O'toole's law which states Murphy was an Optimist!

LOL, this is getting interesting ! :)

Please Log in to join the conversation.

More
6 years 5 months ago #168404 by tommylight
Must have walked over the gantry and the rails over 200 times today as they are on the floor, and i was diving on the Mazak.
Still nothing, but the painter came to tell me that we have to go chose some other paint that should be of higher quality, so there is still hope.
In the mean time i did add cross laser to all 3 of the Z axis, so that is a nice added feature.
Regards,
Tom.

Please Log in to join the conversation.

More
6 years 5 months ago #168998 by tommylight

Attachment not found


-
At least i got some of the parts back, no legs so far so no assembly possible :whistle: :whistle: :whistle: .....

Please Log in to join the conversation.

More
6 years 5 months ago #169018 by phillc54
Well at least it is giving you time to plan the next stage. :)

Please Log in to join the conversation.

More
6 years 5 months ago #169022 by tommylight

phillc54 wrote: Well at least it is giving you time to plan the next stage. :)

Besides the aluminium gantry for the smaller one, everything else is ready and waiting to be bolted.
I even fixed one of the two broken plasma cutters i had in the shop, it is a HF/HV start Cebora at 50A, now at 35 to 40 as i had to cut and remove one of the three primary copper windings on the big transformer.
That is a nice opportunity to test the THCAD300 with HF, and i think i found a way to use the nozzle for ohmic probing without blowing everything up, maybe some of the things ...... :)
That definitely is not doable on all plasma cutters. Results and subsequent flames to follow ! :)
Oh BTW, none of them have a table yet, so more waiting is in order.

Please Log in to join the conversation.