Hypertherm 45XP sanity check
10 Apr 2021 04:40 #205499
by rodw
Well if you make the Plasmac gantry 90 metres long like one shop I know, the need for a crane will be much reduced!
Replied by rodw on topic Hypertherm 45XP sanity check
Haha - food for thought! Will PlasmaC be 5 axis ready by then?
Well if you make the Plasmac gantry 90 metres long like one shop I know, the need for a crane will be much reduced!
Please Log in or Create an account to join the conversation.
10 Apr 2021 21:31 #205564
by andypugh
Cripes! I thought I was joking.
(Though whilst thinking that the idea had merit)
Replied by andypugh on topic Hypertherm 45XP sanity check
Well if you make the Plasmac gantry 90 metres long like one shop I know, the need for a crane will be much reduced!
Cripes! I thought I was joking.
(Though whilst thinking that the idea had merit)
The following user(s) said Thank You: rodw
Please Log in or Create an account to join the conversation.
11 Apr 2021 07:50 #205606
by Mud
Replied by Mud on topic Hypertherm 45XP sanity check
My little building won't come close to 90m, but likely around 7x12-20m or so - worth some consideration!
I think the most viable solution may be to use a typical elevated track for the lifting gantry (coming off of the frame of the building), and mount the plasma to the floor (avoiding excess moving mass, over-long z axis, frame deflection, etc.). I would use a separate table.
Plenty of time to change my mind...
I think the most viable solution may be to use a typical elevated track for the lifting gantry (coming off of the frame of the building), and mount the plasma to the floor (avoiding excess moving mass, over-long z axis, frame deflection, etc.). I would use a separate table.
Plenty of time to change my mind...
Please Log in or Create an account to join the conversation.