Some progress made and some pictures:
All side "L" mounted, rails cut to size for the small one (model T1525, 1.5X2.5M) and test fitted, the rails on the big one are already bolted in.
All rails will be bolted in a zig-zag pattern, just in case i might need to move them to a different mounting place, there will be a lot of things "hidden" under there, that will take a lot of "measure once, cut twice" building technique implementation. Also notice the SAE90 oil dripping all over from the carriages, i am sure that they will never get oiled again after they go out of this shop.
This is one of the sides with rails attached and in "normal" orientation, all the others are still upside down.
All the rails and carriages in place, for now,
Some aluminum parts that will become "uprights" , but having some issue with hiding the motors and reduction and belt drive in there, not much space anywhere when all the stuff gets added and i am trying to hide everything so it looks "neat" from the outside.
Already assembled the test electronics and motors, not using the expensive stuff until this gets back from powder coating and gets assembled again. I used to use the new stuff while building, by the end it was not new anymore, so now i use old stuff for fitting and testing. China drives, Japan motors and a 24V/16.5A power supply, needs 2 more relays to be added.
Waiting for some L shaped aluminum, 80X40X8mm, it is about 3KM far from me but it is 3.5M long so it wont fit in my car, i did try. Must take the cordless circular saw and chop it to smaller pieces there. Just remembered, i have to order some side panels that have to be cnc cut. Any ideas what to put there ?