Control cabinet\box rebuild

  • BeagleBrainz
  • Topic Author
  • New Member
  • New Member
More
6 years 3 weeks ago - 6 years 3 weeks ago #185577 by BeagleBrainz
Replied by BeagleBrainz on topic Control cabinet\box rebuild
That's going to be the next problem, where do I put the monitor once I have my enclosure in place. My total work space is 5.4 x 2.4, with 600mm wide racking on each long wall it's a little cramped. Just enough room for storage on one side and lathe, mill & workbench space on the other. I reckon Tommy has probably built a plasma table bigger than my work space.
Last edit: 6 years 3 weeks ago by BeagleBrainz.

Please Log in or Create an account to join the conversation.

More
6 years 3 weeks ago #185579 by tommylight

BeagleBrainz wrote: My total work space is 5.4 x 2.4, with 600m wide racking on each long wall it's a little cramped

600M !! :)
The following user(s) said Thank You: BeagleBrainz

Please Log in or Create an account to join the conversation.

More
6 years 3 weeks ago #185583 by rodw
Replied by rodw on topic Control cabinet\box rebuild

BeagleBrainz wrote: That's going to be the next problem, where do I put the monitor once I have my enclosure in place. My total work space is 5.4 x 2.4, with 600mm wide racking on each long wall it's a little cramped. Just enough room for storage on one side and lathe, mill & workbench space on the other. I reckon Tommy has probably built a plasma table bigger than my work space.


Pfft!! A walk in the park. My shed at home was 2.4 x 4.8 and I had a lathe, mill, big MIG welder, bandsaw and bench grinder! It also has a lot of shelving. It took me 3 months before I worked out where I could put the mill before I bought it! I had to do a $1500 storage makeover to make it all fit and that was after $500 of shelving in the garden shed so I could get non-shop stuff out the shed!

Please Log in or Create an account to join the conversation.

  • BeagleBrainz
  • Topic Author
  • New Member
  • New Member
More
6 years 3 weeks ago #185593 by BeagleBrainz
Replied by BeagleBrainz on topic Control cabinet\box rebuild
Oh yeah I forgot about a 3 tonne jack + axle stands, engine crane, engine stand, ATV lift, front & rear paddock stands, metal bandsaw, drill press, table saw, bench grinder, disc sander, mini table saw, air compressor, drop saw. Bike lives on the front porch ;)

I have some extra body work for the Monster in my bedroom as well as a spare set of forks under the bed.

The ex wife may or may not have some of my old bikes in her garage. I'm not game to ask.

Please Log in or Create an account to join the conversation.

  • BeagleBrainz
  • Topic Author
  • New Member
  • New Member
More
5 years 10 months ago - 5 years 10 months ago #192092 by BeagleBrainz
Replied by BeagleBrainz on topic Control cabinet\box rebuild
Things move slow.
1000 more things to do.
But just a quick update.
This is the "A" side (aka rear), Odroid, MESA cards & Stepper drivers.
The "B" side (aka front)has the driver for the servo motor spindle, and some control gubbins to turn power on and off.
All panels and uprights to be stripped of powder coating and gold passivated plated. Vents will need some sort of filter material to prevent chip, spiders and snakes getting in. Cooling needs sorting as well.
Would of liked more space but it is what it is.
Last edit: 5 years 10 months ago by BeagleBrainz.

Please Log in or Create an account to join the conversation.

More
5 years 10 months ago #192116 by johnmc1
Replied by johnmc1 on topic Control cabinet\box rebuild
Very compact well done
The wiring layout will be interesting to see.:)
cheers john

Please Log in or Create an account to join the conversation.

Time to create page: 0.470 seconds
Powered by Kunena Forum