2 years 11 months ago #286532 by Joco
This is a short video I did checking the performance of the new dual linear rails on the gantry.  This is a pure motion check no cutting involved.
Acceleration is 2500mm/s^2 and feed speeds are 7000mm/min.  So its pretty quick.   Rapids are at 240000mm/min.

Overall observations is it is significantly more ridgid than before.  I was constrained to accelerations of 1000mm/s^2 as anything over that you could really see the torch wobbling and vibrating on the sudden direction changes.  If I push to 3000mm/s^2 then the inertia in the stepper motors on the x-carriage start to cause twist in the gantry beam and so some vibration begins.



Cheers - J.
The following user(s) said Thank You: tommylight
More
2 years 11 months ago #286847 by Joco
Got laser cross installed on a 3d printed bracket and hooked up to the UI.
 

 
The following user(s) said Thank You: tommylight, rodw
More
2 years 10 months ago - 2 years 10 months ago #287122 by Joco
SOLVED - VPN to the rescue.  While my fixed IP is still blocked (pushing 4 days now) I can use a VPN (lucky I have a subscription) to get in.  And since that is a floating IP I can just shift servers if there are anymore silly blocking issues.

Team - my IP address has been blocked by the forum for several days. The only way I can access things is via my mobile phone which is very awkward and annoying.

While I will periodically check access, I am sad to say that until the situation resolves I will be, for all intents and purposes, absent.

If an administrator sees this and can remedy the problem that would be greatly appreciated.

Regards - Joco (James)
Last edit: 2 years 10 months ago by Joco. Reason: VPN to rescue.
More
2 years 10 months ago #287719 by Joco
In an effort to improve the torsional strength on the gantry beam I designed these brackets that have a block which pushes into the gantry about 23mm and is a tap-in fit.  The bracket is 6mm steel and were cut out on the plasma table.

The video of the items being cut along with a spanner for a the 45mm nut on washing basin waste water fittings.


Setup on the manual mill using a small fixture table.
 

Roughing out the block insert using a 20mm insert mill.  This deals with the hard edge left by the plasma cut.  Transitioned to a 6mm carbide endmill to bring to final dimensions and get down to a 3mm radius on the corners.
 

Parts done and ready for assembly.
 

 

Installed into gantry and ready for stiffness checks.
 

 

Stiffness checks dry run using 3000mm/s^2 and feeds of 8000mm/min.


Cheers - J.
 
The following user(s) said Thank You: tommylight
More
2 years 7 months ago #297311 by Joco
I have started working on the proper electronics cabinet for the table.  I needed something that was going to be close to the moving end with the cables off the gantry and that would cope with the hinged natue of the table top.So here is the resulting mounting system.  Next stage will be moving all the electronics off the prototype board and into this cabinet. 

 

 

 

Cheers - J.
The following user(s) said Thank You: tommylight
More
2 years 1 month ago - 2 years 1 month ago #310586 by Joco
Bit of an overdue update ....

Electronics cabinet has come a long way and know looks like mostly respextable.

With THCAD for ohmic sensing installed
 

I setup ohmic sensing on shielded and unshielded consumables. As I was not able to easily source a machine shield for the PTM80 torch I got a gouging shield, mount it in the lathe and turned the end down so there as 0.5mm gap back to the nozzle.  I did a similar approach to the hand torch standoff.  I had to make a mandrel to mount it on and clamp with a hose clamp. But once that was done turning it down was easy.
 

 

Next I made a "fence" on X0 (X is my long axis compared to the YY one).  This was done using 3adjustable triangles which i then aligned using a DTI.  Accurate to within 0.02mm over the whole travel.
 

Final update is some work I have been doing to enhance the YY axis travel.  My machine had been 610 x 1240mm on YYX config.  This allowed for indexing full 2400x1200 sheets through the machine even though I did  not have room for a machine of that size (hence the fence).  But I wanted to try and improce on the YY travel. I have figured out how to get it to 700mm.  Stage 1 gets me to 690mm and these new over travel flags support that extended travel.
 

 

Finally the machine making parts for the machine:


Cheers - J.

 
Last edit: 2 years 1 month ago by Joco.
The following user(s) said Thank You: tommylight, Clive S