just fit the drives in place now i have a small problem . Cncbasher hook the wires for the encoders and some of the limits but i dont know if all of them . I will try to rewire the machine on the mesa and see exacly what is instaled . Also the M19 is the POS on the spindle module and it was working then i got the bosch plc out
Replied by aventtini on topic Traub Bosch cc100 retrofit
just fit the drives in place now i have a small problem . Cncbasher hook the wires for the encoders and some of the limits but i dont know if all of them . I will try to rewire the machine on the mesa and see exacly what is instaled . Also the M19 is the POS on the spindle module and it was working then i got the bosch plc out
Please Log in or Create an account to join the conversation.
06 Jun 2015 22:38 #59530
by aventtini
Replied by aventtini on topic Traub Bosch cc100 retrofit
I just rewire some of the old changer wires but i was thinking that i will use like a normal axis the all tool changer . That mens we have power on the tool changer all the time , I was thinking my drives are to small for this . I will connect them in the safety loop . Based on the encoder i know exsclly the tool position after homing thats the good part .
Please Log in or Create an account to join the conversation.
09 Jun 2015 18:13 - 10 Jun 2015 01:01 #59650
by aventtini
Replied by aventtini on topic Traub Bosch cc100 retrofit
I solve the wiring now we go to the unknown part the linuxcnc setup
Last edit: 10 Jun 2015 01:01 by aventtini.
Please Log in or Create an account to join the conversation.
10 Jun 2015 15:52 #59667
by aventtini
Replied by aventtini on topic Traub Bosch cc100 retrofit
Please Log in or Create an account to join the conversation.