- Posts: 5713
- Thank you received: 2100
It is not helping that you have the same query going on in three different threads.Bhushan wrote: paused motion isnt working in my case also sir
using linuxcnc-plasmac
Please Log in or Create an account to join the conversation.
Please Log in or Create an account to join the conversation.
Please Log in or Create an account to join the conversation.
Connect your DMM across your work piece and electrode connections
Please Log in or Create an account to join the conversation.
Please Log in or Create an account to join the conversation.
islander261 wrote: The best place to connect your DMM for measurements is at the electrode and work piece terminals in your power supply.
This will expose you to potentially lethal voltages so don't do it if you don't have the knowledge or skills to do it safely. Do not operate your machine with the cover off! Connect extension wires to the measurement points so you can run with the covers on and carefully insulate the meter connections.
If you have a CPC port use those connections.
Since you have already checked the THCad calibration with a battery connecting the meter at the THCad card input will give you little benefit without knowing the arc voltage by another means.
Please Log in or Create an account to join the conversation.